97免费在线观看视频,亚洲综合自拍网,黄色毛片免费观看,热久久综合网,免费看日产一区二区三区 狠狠操av,久久久涩涩涩,在线精品免费视频,人人插天天干,久久91精品国产91久久

單項(xiàng)選擇題

Which of the following statements is correct for the design and installation of diesel engine cooling water systems?()

A.An alarm device with audible and visible signals is required for all cooling water systems
B.Propulsion engines with bores over 200 mm are to be fitted with cooling water jackets
C.Each totally enclosed cooling system shall be provided with a suitable head tank
D.Drain cocks are to be provided at the lowest points of all cylinder water jackets

微信掃碼免費(fèi)搜題